Ridership study to be conducted for Singapore-JB Rapid Transit System

The study is expected to start in early 2016 and be completed in the third quarter of the year.

SINGAPORE: The Land Transport Authority (LTA) is looking for a consultant to conduct a ridership study for the Rapid Transit System RTS project that is set to link Singapore and Johor Bahru.

A tender was called on Monday (Dec 7) and LTA said this is the next step in line with milestones for the rts jb project. The consultant will also provide commercial advisory services for a detailed study of the commercial and operating model for the rts JB Singapore project.

The study is expected to start in early 2016 and be completed in the third quarter of the year. The rts JB Singapore project was targeted to be ready by 2019, though LTA said the timeline is still being discussed by Singapore and Malaysia and will be announced when ready.

Singapore previously said its RTS JB terminus will be at Woodlands North Station, along the new Thomson-East Coast MRT line.

Malaysia has also confirmed its rts JB terminus will be sited at Bukit Chagar.

 

Source: http://www.channelnewsasia.com/

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s